Reservoir Dredge Comparison Map
The Mapping Network completed a bathymetry survey to show the status of a dredging project for a drinking water reservoir. The comparison map was calculated to verify the amount and location of material removed. Areas still needing to be dredged are located and the dredging contractor will focus their efforts on those locations. This verifies the dredging has reached the planned depths and keeps all parties on the same page. About The Mapping Network: The…